Practice17.01.267 min
The first year is when a system holds or rots
Twelve months of stewardship is in every contract. Here is what we actually do during it.
Lê Minh Châu
- Practice
- Stewardship
- Rollout
Identity systems do not fail at launch. They fail in month five, when a regional office needs a template that does not exist and makes one, and in month nine when that template has been copied four times.
What we watch for
The first unauthorised template. The first time the logo is redrawn rather than placed. The first colour that is nearly right. Each of these is trivial on its own and each one is a precedent, which is the only thing that matters.
What we do
A quarterly review with whoever is actually producing material, not with whoever commissioned the work. Most of what comes out of it is new templates: the system was missing something, somebody solved it, and our job is to make the solution official before it multiplies.