Strength
Progressive overload, explained without the maths
Trần Đức Minh, Head of StrengthSeptember 20266 min read
Add a little weight, every week, for as long as it works. It is the oldest idea in strength training — and the one most people abandon a month too early.
Your body adapts to what you ask of it, and then stops adapting once the ask is easy. Progressive overload simply means making the ask a little harder, on purpose, on a schedule — more weight, more reps, or the same work in less time.
The first twelve weeks are free
If you are new to the barbell, almost anything works. On the Iron Floor we add 2.5 kg to the squat and deadlift every session and 1 kg to the press every week. Most beginners ride that for three months before the bar starts to argue.
A stall is not failure. It is the programme telling you it has done its job.
When the numbers stop moving
Then we change the lever, not the idea. Your coach will usually try these, in this order:
- Add reps before weight — three sets of five becomes three sets of six, then seven
- Move to weekly progress — a heavy day, a lighter day, and a new top set each Friday
- Deload for a week at 70%, then build again from a little below the old best
What we track
Every set you log in the app goes into your training history. At each twelve-week test day we sit down with you, look at the curve and write the next block. That is the whole secret: somebody is paying attention.