How we work
Five stages, one calendar
You will know the fee, the budget and the timetable before the first drawing is made. Here is what happens, and when.
Fig. 01 — Working drawings for the Ba Vì guesthouse
01How we work
Five stages, no surprises
A home usually takes nine to fourteen months from first visit to handover. You will know the fee, the budget and the calendar before any drawing begins.
01Week 1–2
Listen
A conversation at the studio, then a morning at your home: how you live, what you keep, what the light does at four in the afternoon.
02Week 3–8
Survey & concept
A measured survey, two layout options and a first material board. We agree the budget line by line before going further.
03Month 3–4
Design
Full drawings for every wall, light and cupboard, with samples you can hold. Bespoke pieces are drawn at 1:10.
04Month 5–11
Build
We choose the contractor with you and are on site twice a week. Our workshop makes the furniture in parallel.
05Final month
Settle in
We install, style and hang the last lamp, then come back after six months to adjust whatever the house has taught you.
02Before we draw
A budget you can hold us to
After the survey we send a written proposal: the design fee per square metre, a line-by-line build estimate from two contractors, and a price for every piece of furniture we plan to make. Changes after that are priced before they happen, never discovered on the final invoice.
Read the questions- Contractor quotes on every build
- 2
- Site visits a week while building
- 2×
- Return visit after handover
- 6 mo
03Before & after
The same room, given back its light
An apartment in a 1932 villa on Phan Đình Phùng had been divided by partitions and false ceilings for forty years. Drag across the photograph to see the room as we found it and as we left it.
- 01Two partitions and a false ceiling removed
- 02Original 3.8 m ceiling and cornice restored
- 03Cement tiles lifted, cleaned and relaid
- 04Oak joinery built into the old doorway
04Questions
What people ask before we begin
Anything else, write to us — we would rather answer properly than have you guess.
01How are your fees calculated?
Interior architecture and design are charged as a fixed fee per square metre, agreed after the survey — usually 900,000 to 1,400,000 ₫ per m² depending on scope. Furniture is priced piece by piece. There are no commissions on anything we buy for you.
02Do you work outside Hanoi?
Yes, across northern Vietnam and occasionally in Đà Nẵng and Hội An. For projects more than two hours from the studio we add travel to the fee and plan fewer, longer site visits.
03Can you work with the contractor we already have?
Often, yes. We meet them early, share full drawings and visit the site twice a week. If we have concerns about quality we will tell you before work starts, not after.
04Is there a minimum project size?
For design work, one complete room. For bespoke furniture there is no minimum — we make single pieces too.
05How long does a typical apartment take?
Around six to nine months: two for design, three to five for building, and a final month for furniture and styling. Heritage buildings take longer, because they always hold surprises.
Begin
Tell us about the room you want to live in
A first conversation is free and takes about an hour — at the studio, on site, or over a call.