ISO 27001 · SOC 2 Type II · CMMI Level 3

+84 28 3822 9100

Services

Five engagements. Each one priced fixed after we have walked your floor.

You are never asked to commit to the next engagement in order to finish the current one.

  • Fixed price after survey
  • No pilot fee
  • Rollback held one full cycle

What you get

Each engagement stands alone and each one ends with something you keep.

Most clients take them in order, but nothing forces that. The survey is useful even if you hand it to another vendor.

01

Signal survey & assessment

Three weeks on two representative sites, mapping every tag, gateway, historian and manual log. You receive the map whether or not you engage us further.

  • Tag inventory & ownership
  • Gap and duplication report
  • Fixed-price deployment quote
Detail
02

Platform deployment

Shadow run in parallel with your existing systems, then a line-by-line cutover with the rollback window held open for a full production cycle.

  • Parallel ingest & reconciliation
  • Line-by-line cutover
  • Rollback held one full cycle
Detail
03

Integration engineering

Connectors for the systems that will not move — the 1998 SCADA, the ERP nobody will upgrade, the lab instrument with a serial port.

  • OPC UA, Modbus, MQTT
  • ERP & LIMS bridges
  • Legacy protocol adapters
Detail
04

Compliance & audit readiness

Signed, tamper-evident records and audit packs that assemble themselves. Built by people who have sat on the other side of the inspection.

  • 21 CFR Part 11
  • ISO 27001 evidence
  • Automated audit packs
Detail
05

Managed operations

We hold the on-call rotation while your team learns to run it. Twelve months is standard; some clients keep it indefinitely.

  • 24/7 on-call rotation
  • Quarterly health review
  • Runbook stewardship
Detail

Method

A deployment path that survives contact with a live plant.

  1. 01Weeks 1–3

    Signal survey

    We map every tag, gateway and manual log across two representative sites before a single line is written.

  2. 02Weeks 4–9

    Shadow run

    Northbound ingests in parallel with your existing historian. Nothing is cut over while the deltas are reconciled.

  3. 03Weeks 10–16

    Controlled cutover

    Line by line, with rollback held open for a full production cycle and your engineers holding the switch.

  4. 04Week 17+

    Handover

    Runbooks, on-call rotation and an assurance pack your auditors accept. We stay on retainer, not on life support.

Questions

What procurement usually asks first.

Can this run entirely inside our network?

Yes, including fully air-gapped. Roughly 60% of our deployments have no outbound connectivity at all. Updates ship as signed bundles your team applies on your schedule.

What happens to our data if we terminate?

You export everything — signals, audit log, configuration — in open formats, at any point, including after termination. We hold nothing back as leverage and there is no export fee.

Do we have to replace our historian?

No. Most clients keep theirs for years afterwards. Northbound ingests alongside it and becomes the system of record only when your team decides it has earned that.

How long before we see anything real?

The signal survey returns a usable map of your data estate in three weeks. Shadow running on live data typically starts in week four.

Who owns the integration code you write for us?

You do, for anything specific to your plant. Platform connectors stay ours, but they are covered by the licence in perpetuity — including after the contract ends.

What does this cost?

Deployment is fixed-price, quoted after the survey, and has ranged from USD 180k to 2.4M depending on site count and integration depth. Annual platform fees scale with signals ingested, not seats.

Bring us your hardest site.

A briefing runs ninety minutes with your operations and IT leads in the room. You leave with a signal survey scope and a fixed-price number — no pilot fee, no procurement theatre.