Case studies
Published with the client’s sign-off, measured with the client’s numbers.
We do not publish a case study the client has not read, and we do not publish figures we calculated ourselves.
- Client-verified figures
- Named clients only
- Published in full
Case studies
What changed, measured the way the plant measures it.
Every figure below was taken from the client’s own reporting, not ours, and published with their sign-off.
Đông Hải Steel
Steel & metals · 6 sites
Eleven years of unprovable process data turned into accepted regulatory evidence in six months.
−94%
Supplementary evidence requests
Mekong Power
Power generation · 3 plants
Unplanned outage attribution cut from four days of argument to a report generated before the shift ends.
4d → 40m
Time to attribute an outage
Bình Minh Plastics
Chemicals · 9 lines
Batch genealogy assembled automatically, turning a three-week recall simulation into a same-day exercise.
21d → 6h
Recall trace time
Hanoi Water
Water utilities · 18 stations
Regulatory submissions assembled from signed source records rather than re-keyed spreadsheets.
100%
Submissions accepted first pass
- 99.98%
- Platform availabilityRolling 24 months
- 240
- Production sites14 countries
- 12s
- Failover recoveryMeasured, not modelled
- 4.1B
- Signals ingested dailyPeak 92k/sec
Bring us your hardest site.
A briefing runs ninety minutes with your operations and IT leads in the room. You leave with a signal survey scope and a fixed-price number — no pilot fee, no procurement theatre.