Case study

Đông Hải Steel: eleven years of data they could not prove was unaltered.

Six sites, 340,000 tags, three incompatible historians — two from vendors that no longer exist.

  • Steel & metals
  • 6 sites
  • 17 weeks to cutover
  • Live since March 2025
Client
Đông Hải Steel
Sector
Steel & metals
Sites
6 across 2 provinces
Engagement
Survey → deployment → stewardship
Duration
17 weeks to cutover
Live since
March 2025

01The problem

Đông Hải had eleven years of process history across three incompatible historians, two of them from vendors that no longer existed. The data was there. What they could not do was prove to their regulator that any given record had not been edited after the fact — so every submission triggered a supplementary evidence request, and each of those consumed roughly forty engineer-days.

02What we did

The survey found 340,000 tags, of which 41% were orphaned — written by equipment nobody was reading. We ingested the three historians in parallel for nine weeks and reconciled them against the shift books, which is where the real disagreements surfaced. Cutover ran line by line over seven weeks with rollback held open through a full production cycle on each.

03What changed

Every write is now signed and replayable to a point in time. Six months after cutover the regulator stopped issuing supplementary requests entirely. The forty engineer-days per submission went to zero, and the team that used to assemble evidence packs now works on kiln optimisation instead.