Case study

Mekong Power: four days of argument about ninety seconds.

Three plants, three clocks that disagreed by up to nine seconds, and an outage report nobody would sign.

  • Power generation
  • 3 plants
  • 5 months to cutover
  • Live since June 2025
Client
Mekong Power
Sector
Power generation
Sites
3 plants
Duration
5 months to cutover

01The problem

Every unplanned outage started a four-day argument. The turbine historian, the grid operator log and the shift book each told a different story about the same ninety seconds, and attribution was settled by whichever account had the most senior person behind it.

02What we did

One time base. Each source is ingested with its original timestamp and its measured clock offset recorded alongside, so a sequence of events is rebuilt from records rather than reconstructed from memory. Attribution runs as a report against signed data, not as a meeting.

03What changed

An outage report is produced before the shift ends, from records the grid operator can read directly. The four-day argument no longer has anything left to argue about.