ISO 27001 · SOC 2 Type II · CMMI Level 3

+84 28 3822 9100

Case study

Bình Minh Plastics: a recall simulation that took three weeks.

Nine lines, four resin suppliers, and genealogy that existed only as a chain of people who remembered.

  • Chemicals
  • 9 lines
  • 4 months to cutover
  • Live since October 2025
Client
Bình Minh Plastics
Sector
Chemicals & polymers
Lines
9 extrusion lines
Duration
4 months to cutover

01The problem

Tracing a suspect batch back to its resin lot meant three weeks of work by the two people who knew where the paperwork lived. The annual recall simulation was passed on effort, not on system, and everyone in the room knew it.

02What we did

Genealogy is written as the batch is made, not reconstructed afterwards: every charge, blend and changeover is linked to the lot that fed it at the moment it happens. The trace is a query over signed records, and the same query serves the drill and the real thing.

03What changed

The most recent simulation closed inside a working day, with the trace exported straight from the platform. The two people who knew where the paperwork lived are now doing process engineering instead.

Bring us your hardest site.

A briefing runs ninety minutes with your operations and IT leads in the room. You leave with a signal survey scope and a fixed-price number — no pilot fee, no procurement theatre.