Long An regional logistics hub
Mekong Cold Chain JSC
- Tân Đức Industrial Park, Long An
- 120,000 m²
- 2026
- Design & build
Project overview
The largest building we have delivered: a single-roof distribution hub for the southern region with 84,000 m² of ambient high-bay storage, 18,000 m² of chilled and frozen rooms, 96 dock doors and a four-storey control building. It serves 2,300 stores across the Mekong Delta and Ho Chi Minh City.
01The challenge
Twenty-one hectares of former rice paddy with soft clay to twenty-four metres, a lease that started in August 2026, and a racking system that needed a floor flatter than anything the park had seen.
02Our solution
We improved the ground with prefabricated vertical drains and a six-month surcharge while the steel was fabricated, then cast the 84,000 m² slab in 38 laser-screeded pours. Roof steel went up in two directions at once with four crawler cranes, topping out two weeks ahead of programme.
Project data sheetDS-2026-003
| Client | Mekong Cold Chain JSC |
|---|---|
| Location | Tân Đức Industrial Park, Long An |
| Site area | 21 ha |
| Gross floor area | 120,000 m² |
| Contract | Design & build, re-measured |
| Structure | Steel portal frames, 48 m clear span |
| Clear height | 32 m high-bay, 12 m ambient |
| Cold rooms | 18,000 m², +4 °C to −25 °C |
| Floor | FM2 superflat, 7 t/m² racking load |
| Handover | August 2026 |
- Dock doors on two faces
- 96
- Roof and frame steel
- 3,100 t
- Ahead of programme at topping out
- 2 weeks
Fig. 01 — Ambient high-bay hall, racking installed Fig. 02 — Pick faces, zone C Fig. 03 — Inbound staging area
“They built the floor our racking supplier said could not be built in the time we had. Then they finished early.”