EPC contractor · Since 2004
We build the places Vietnam makes things
Factories, warehouses, logistics centres and bridges — designed, procured and built by one contractor, under one safety standard, handed over on the date we signed.
- Years building
- 22
- Projects handed over
- 480+
- Square metres built
- 3.2M
- Days without lost-time injury
- 2,140
21.0285° N · 105.8542° E
Trusted by
- Kanto Precision
- Mekong Cold Chain
- Veltra Components
- Hòa Bình Dairy
- Southern Gateway
- Aurelia Pharma
- Tây Đô Fresh
- Norden Solar Asia
01 Capabilities
Design, procure, build — one contract
Six disciplines under one roof, so the people who draw the grid lines are the same people who pour the footings.
01
Industrial plants, *built to run* on day one
Electronics, food and precision-engineering plants with clean rooms, crane bays and utility buildings, delivered EPC.
- Clean rooms to ISO 7
- Crane bays up to 50 t
- Utility and process buildings
02
Warehouses built for *throughput*
Ambient and cold-chain distribution centres, cross-docks and high-bay stores built for racking loads and fast handover.
- High-bay to 32 m
- Cold rooms to −25 °C
- FM2 superflat floors
03
Bridges and roads that *open the site*
Road and river bridges, industrial-park roads, drainage and site utilities — the civil works that let a plant open on time.
- Spans to 180 m
- Balanced-cantilever and precast
- Park roads and drainage
02 By the numbers
Measured in tonnes, metres and days
- Square metres builtAcross 14 provinces
- 3.2M
- Projects handed over93% on or ahead of the contract date
- 480+
- People on our payrollEngineers, supervisors and craft
- 1,900
- Steel fabricated a yearIn our own Hải Phòng shop
- 18,000 t
03 Selected projects
Handed over on the date we signed
- All sectors
- Manufacturing
- Logistics
- Infrastructure
- Energy
04 How we deliver
One programme, four phases, zero hand-offs
Engineering, procurement and construction overlap on purpose. A typical 50,000 m² plant, drawn the way our planners draw it.
- E
Engineering
Survey, concept, permit and construction drawings in one BIM model. Value engineering while it still costs nothing.
Month 1–5
- P
Procurement
Steel from our own shop, long-lead MEP equipment tendered and expedited. Orders placed off frozen drawings, not final ones.
Month 3–9
- C
Construction
Piling, slab, steel, envelope, MEP and fit-out under one site manager and one daily safety briefing.
Month 5–15
- Cx
Commissioning
Integrated testing with your engineers, training, as-built records and a 24-month defects period.
Month 14–16
05 Health, safety & environment
Everyone goes home the same way they came
Safety is not a department at Stonebridge; it is the first item on every site’s daily plan and the one KPI that can stop a pour.
Stop-work authority
Any worker, subcontractor or visitor can halt a task they think is unsafe — without asking anyone first.
Daily toolbox talks
Fifteen minutes at 6:45 every morning, task by task, in Vietnamese and in the crew’s own words.
Leading indicators
We count near-misses and observations, not only incidents — 38,000 reported last year.
2,140
Days without a lost-time injury
Across all sites since 14 August 2020
- TRIR, 2025
- 0.12
- Safe man-hours
- 9.4M
- Crews inducted before day one
- 100%
ISO 45001
Occupational health & safety
Certified 2018 by Meridian Assurance
ISO 9001
Quality management
Certified 2011, recertified 2024
ISO 14001
Environmental management
Certified 2019, all sites
06 Sectors
Where we build
Four markets, one standard of engineering. Most of our clients come back for their second and third facility.
01164 plantsManufacturingElectronics, automotive parts, food and pharmaceuticals.
02128 facilitiesLogisticsDistribution centres, cold chain, cross-docks and high-bay stores.
0362 bridges & roadsInfrastructureRiver bridges, park roads, container yards and site utilities.
04210 MWpEnergyRooftop and ground-mount solar, substations and battery buildings.
Start a project
Your site. Our programme. One date.
Send us a brief and a site plan. A priced proposal with a programme reaches you within fifteen working days.
Request a quote